Tonnage Calculation Formula:
From: | To: |
The tonnage calculation formula estimates the required clamp force for injection moulding. It calculates the necessary tonnage based on the projected area of the part and a clamp factor that typically ranges from 2-4 tons per square inch.
The calculator uses the tonnage formula:
Where:
Explanation: The formula calculates the minimum clamp force needed to keep the mold closed during injection, preventing flash and ensuring part quality.
Details: Accurate tonnage calculation is crucial for selecting the appropriate injection molding machine, preventing mold damage, ensuring part quality, and optimizing production efficiency.
Tips: Enter the projected area in square inches and select an appropriate clamp factor between 2-4 tons/sq in based on material and part complexity.
Q1: What is the typical range for clamp factor?
A: The clamp factor typically ranges from 2-4 tons per square inch, with higher values used for more complex parts or certain materials.
Q2: How do I determine the projected area?
A: Projected area is calculated as the total surface area of the part as it appears in the mold, including all cavities and runners.
Q3: What happens if I use insufficient tonnage?
A: Insufficient tonnage can cause mold flashing, part defects, and potential damage to the mold and machine.
Q4: When should I use a higher clamp factor?
A: Use higher clamp factors (3-4 tons/sq in) for materials with high viscosity, complex part geometries, or when high precision is required.
Q5: Can this formula be used for all injection molding applications?
A: While this formula provides a good estimate, specific applications may require adjustments based on material properties, mold design, and process parameters.